Suramadu Bridge - Construction

Suramadu bridge essentially is a combination of three types of bridges with overall length of 5438 meters over a width of approximately 30 meters. This bridge provides four lanes in both directions as wide as 3.5 meters with two 2.75-meter-wide emergency lane. This bridge also provides a special lane for motorcyclists out on each side of the bridge.

Flyover

Causeway Road overpass or a bridge built to connect with the road construction through shallow waters on both sides. This flyover consists of 36 spans over 1458 meters on the side of Surabaya and 45 spans over 1818 meters on the side of Madura.

Construction of this flyover using PCI buffer length of each span 40 meters foundation supported 60 cm diameter steel pipe.